Making the Path
The gardener has dug a trench 4" inches deep and 18" wide for the path, and now he's ready to take the next step.
The Gardener fills the trench with recycled crushed concrete to a depth of 2". He spreads concrete sand over the top to bring the bed up to a depth of 3". Next, he lays the Sunrise Flagstones.
The Gardener spreads gravel around the flagstones, and the path is complete.