The gardener has dug a trench 4" inches deep and 18" wide for the path, and now he's ready to take the next step.

Partly Made Path

The Gardener fills the trench with recycled crushed concrete to a depth of 2". He spreads concrete sand over the top to bring the bed up to a depth of 3". Next, he lays the Sunrise Flagstones.

The Completed Path

The Gardener spreads gravel around the flagstones, and the path is complete.